Modular DAC products, engineered for lowest cost per ton. From single site deployments to megaton-scale buildouts.
Four years of iterative process engineering and over 4,000 hours of testing across units in Austria. Soon to be TRL-8 in Canada.
Fixed bed, fluidization and decoupled process - tested as TRL-4 lab prototypes.
TRL-6 validation, first continuous field operation.
4,000+ hours logged across -10°C to 40°C conditions.
TRL-8 deployment, operational in 2026.

"DACLab's low-temperature, low-energy design addresses key barriers to scalable direct air capture. This is an important step as the industry moves from pilots to commercial deployment."Dr. Klaus Lackner — Advisor to DACLab, pioneer in DAC. Developed in partnership with TU Wien.